Lacze Warszawa-Sztokholm

Autor: Lukasz Ploszajski (lukasz_at_frodo.nask.org.pl)
Data: Fri 16 Jun 1995 - 09:02:26 MET DST


Witam wszystkich,

po dlugim braku lacznosci do Szwecji naleza sie wyjasnienia. Oto
odpowiedz, ktora uzyskalismy do Swedish Space Corporation:

----------------------------------------------------------------

          Satellite station at KTH in Stockholm.

          The station is now in operation since midnight CET
          (June 14/15).
          The first report of break in the 2 Mbit link came to
          Sw. Space by phone from Warsaw after lunch on Thuesday
          June 13.
          Looking back, in our logging system the first signs of
          something going out of tune (but not dead) came at 7.30 CET
          the same morning.

          To our personel if first looked as a problem with water
          coming into the feed system and wave-guides, as the transmit
          signal looked as fadeing down a few decibels. All parts in
          the feed system was exchanged, and when switching on again
          it looked normal for a while before the problems occured
          again.

          During Wednsday the feed system was checked once more. We
          then found that the LNB (receiver head) also seemed not to
          work properely. The LNB was replaced, but reception was
          not possible.
          The suspicion was then on common parts, the boxes containing
          power supply and the up/down converter. In the evening the
          power supply was excluded as the source of problem.
          The UP/DOWN converter was changed and adjusted and the
          system went live at about midnight. Confirmation came from
          Warsaw by phone at about 0:30 CET.

          Sw. Space has from time to time during this time been in
          contact with NASK Op Center at Warsaw University.
          In a situation of tracing a fault condition it is impossible
          to tell when the system will be up and running again. The
          only thing we can report is that we are working on the
          problem, on site and in our shop to find the cause and the
          cure.

          The equipment in question is newly delivered and is still
          under warranty. It was installed in March at KTH for running
          the Lviv link and from early April also the transmission of
          the carrier of the Warsaw 2 Mbit link (new).

          We are truely sorry for this break in the services on the
          Warsaw and Lviv links.

----------------------------------------------------------------

-Lukasz Ploszajski



To archiwum zostało wygenerowane przez hypermail 2.1.7 : Wed 19 May 2004 - 15:51:35 MET DST